Signed in Singapore · 21 Sep 2020 · Active: EU green grant
Procurement for Robotic Lab Equipment
TG.F.20200819.0 · Talverin Group · Purchase orders · Completed
Signed in Hong Kong · 19 Aug 2020
The search, re-created from the original design. Company and project names are invented.
Who
Client
The board of a group of five companies
Region
Macau, Taiwan, Guangzhou and Hong Kong: four legal systems
People
About 50, of whom about 40 in mainland China and Macau
My role
Programme Design Lead. Brought in to rescue the programme.
What
Each company kept its documents its own way. Finding one agreement for an audit meant asking around, calling and meeting. Companies in the group sometimes worked on the same thing without knowing. The programme to fix this had stalled: designers wanted freedom, engineers wanted structure, management wanted savings, and nobody held them together.
Read left to right: whose · what kind · when · which one · what it says, before anyone opens the file.
ZCCompanyIts initials: Zenithasia Corp. One code per company, six in all.
FFamilyL legal · F financial · H HR · S strategic · O operational. More than fifty kinds of document, five letters.
20200923Date signedYear, month, day: names sort in time order on any computer.
0SequenceThe first document that company signed that day; the next is 1.
TitleIn plain wordsWhat the document is, readable by anyone.
The naming rule that makes the search work: every company files the same way.
Started with the board, not the backlog. We went through the brief line by line, cut what they did not need, and agreed what could actually be delivered.
Gave each team its own brief inside the shared plan, with short check-ins every three days, under strict confidentiality.
Made one rule for naming every document in every company, so a file’s name alone says whose it is, what kind it is and when it was made.
Added one field everyone could see: active projects. Each company could now see what the others were working on.
Impact
Estimate, combined across the group.
15–20 hours → about 2a week across the group, searching and meeting about documents
Duplicated work stoppedthe active-projects field showed who was already doing what
Chat channels closedthe ones that existed only to find documents
Adopted immediatelythe one objection came from the person whose manual filing the system replaced