Two campuses, one month
Visitors, inspectors and officials kept getting lost. Architects and interior designers had tried signage before; none of it had stuck.
1 month
time to complete the project
It was scheduled for two: from the first floor to every required floor on both campuses.
Two campuses, five to six buildings each. 2018–2020.
地點 Location方向 Directions →
機器在這裡 Machines here
- 焊接机器 372 Welding
- 工業機器人 16 Industrial robot
- 注塑机 09 Injection moulding
- 傳送帶 87 Conveyor belt
- 傳送帶 02 Conveyor belt
- 生産線機器 238 Assembly line
Where am I, and what is here?
- The place name on screen matches the poster on the wall: scan it, or look it up.
- Every machine in this place, with its last inspection, wear and status at a glance.
- One tap to directions to anywhere else on either campus.
← Factory 工廠 02 南京 Nanjing
焊接机器 372
Welding
Manuals
操作手冊PDF
安全手冊PDF
Operational manual
Who to ask
導師 Supervisor張 Zhang值班主任 Shift supervisor王 Wang
清單 Checklists
A− A A+
How do I run this machine safely?
- Manuals in both languages, one tap away, instead of a binder somewhere on the floor.
- The supervisor and shift supervisor, by name: who to ask, right now.
- Checklists for operations, maintenance and receiving, step by step, with larger text when needed.
← 焊接机器 372 Welding
從 From
到 To
- Exit the building from gate C.
- Take a golf cart to Factory 05.
- Enter Factory 05 from gate B.
- Take lift 03 to the 7th floor.
- Turn left; walk 100 metres to 合肥 Hefei.
- 從 C 門離開建築物。
- 乘坐高爾夫車前往工廠 05。
- 從 B 門進入工廠 05。
- 乘坐 03 號電梯到達 7 樓。
- 左轉步行 100 米,直到看到合肥。
How do I get to the next building?
- Step by step between buildings: gates, golf cart, lift and floor.
- In English and Chinese, for visitors and staff alike.
- It ends at a named place: the same name printed on the poster when you arrive.
Who
- Client
- NDA · Electronics manufacturer
- Region
- Mainland China, 2018–2020
- Scale
- Two campuses of five to six buildings each
- My role
- Design Lead and Managing Director. Led the design and its delivery through my consultancy.
What
Staff moved between buildings by bicycle, scooter and golf cart. Workers, engineers, visitors, health inspectors and government officials all needed to find a place, a machine or a safe way out, and the numbering made sense only to the people who already knew it.
How
- Named places instead of numbering them. Areas took the names of cities, safety exits the names of classical poets: names people already carry in their heads. The named exits sit alongside the mandated green exit signs; they do not replace them.
- Put both languages on every sign, with arrows to the two nearest exits.
- Put every machine’s manuals, checklists and supervisors one tap away, in a simple bilingual web app, with directions between buildings.
- Proved it small, then scaled it. One floor in the first week, one building live in the second, a one-week pilot, then every required floor on both campuses.
Impact
- 1 month, not 2delivered in half the agreed time
- Found their way unaidedvisitors, inspectors and government officials, without an escort
- Extendedthe client commissioned a follow-up project
See the directory working (prototype, sample data) →
The client followed up with more projects. One of them: the app we didn’t ship →